every project is a challenge

Social building sector

Year Type and location of the works according to contract Description of works
2014 Combined building – hotel, commercial, bank, offices and other spaces at UPI IV, town of Etropole; Stage 2 of Block A Delivery and installation of subpart HVAC
2013 Repurposing, reconstruction and energy efficiency measures in a dedicated administrative part of a building on Knjaz Dondukov 68, headquarters of Generally Insurance JSC Delivery and installation of subpart HVAC
2013 Multifunctional complex “San Stefano Plaza” Sofia Delivery and installation of ventilation extraction system on 2,3,4 sublevels to -3.6m.
2013 Residential building with underground parking places, offices and coffee shop, UPI III kv. 55m. Lagera, Sofia Delivery and installation of HVAC systems
2012 Renovation of a Child clinic at level 0.00 – Traumatology and corresponding quarters at UMBAL MS Pirogov Delivery and installation of ventilation and air conditioning systems
2012 Storage base and offices UPI IX – 612 kv. 21A, Krivina village, Simba Toys OOD Delivery and installation of HVAC systems
2011 Repurposing and renovation of floor 4 of administrative building on Kaloyan street 8 – “High Lawyer Council” Delivery and installation of ventilation and heating systems
2011 National health complex – town houses in UPI III kv. 153, town of Berkovica Delivery and installation of HVAC systems
2011 Single story buildings and repurposing of level 0.00 and -3.2 of SPKO at UMBALSM Pirogov Delivery and installation of HVAC systems

Industrual sector

Year Type and location of the works according to contract Description of works
2014г. Internal reorganization of the office-building logistic warehouses of “Orgachim” AD – office building with stores of “Libra” EAD Delivery and installation of air conditioning systems
2014 Building for sample separation, in the territory of Elacite complex Delivery and installation of works in part HVAC and Technological systems
2014 Filtration system for dusted extract air from ventilation of KET 1 – ProSonic dust separation system Delivery and installation of works in part HVAC and Technological systems
2013 Separation systems for Vermiculite material for the Helix company in town of Elin Pelin Delivery and installation of subpart HVAC and Technological – filtration of dust from the exhaust air
2013 Filtration station of exhaust mining water, leaking from the site of Elacite complex Delivery and installation of subpart HVAC
2013 Oil storage at TAT unit Delivery and installation of works in part HVAC
2012 KET 3 Trestle and over loaded junction – fresh air induction in the territory of Elacite complex Delivery and installation of works in part HVAC and Technological systems
2012 Overloaded junction in Small and medium splitting hall Delivery and installation of works in part HVAC
2012 Reconstruction of Molybdenum manufacturing Delivery and installation of works in part HVAC
2011 EBB manufacturing hall. Subproject: Intermediary storage of micro bubbles Delivery and installation of works in part HVAC

Design

Year Type and location of the works according to contract Description of works
2014 Construction of a multipurpose sports hall – Pleven UPI II1076 Design works in part HVAC and Energy Efficiency
2014 Sports hall with a center for reabilitation and integration of people with disabilities – Drqnovo UPI XIII Design works in part HVAC and Energy Efficiency
2014 Construction of sewage water treatment plant, sewage network and rehabilitation of water supply network – Lukovit Design works in part HVAC and Energy Efficiency
2013 Design and construction of sewage water treatment plant – Vidin Design works in part HVAC and Energy Efficiency
2013 Preparation of working phase design and construction of the main infrastructure, stage 1 of regional waste depot – Razlog, Bansko, Belitsa and Yakoruda Design works in part HVAC and Energy Efficiency
2013 Design and construction of a regional waste depot, sage 1 – Pleven Design works in part HVAC and Energy Efficiency
2013 Regional system for waste management in Pernik /aid contract: dir-592115-c001/ Design and construction of a sorting and composting factory Design works in part HVAC and Energy Efficiency
2013 Construction of an information center at Hunting grounds “Palamara” – Shumen Design works in part HVAC and Energy Efficiency
2013 Reconstruction of a building with local historical and cultural significanse and improving the surrounding area including landshafting – Karamanovo, Cenovo municipality Design works in part HVAC and Energy Efficiency
2013 Reconstruction and repurposing of a natural juice prodiction hall into storage facility for bottled drinks, black and white appliances with an administrative section – Sofia Design works in part HVAC and Energy Efficiency
Cool Consult