every project is a challenge

Design

Year Project Description of works
2014 Construction of a multipurpose sports hall – Pleven UPI II1076 Design works in part HVAC and Energy Efficiency
2014 Sports hall with a center for reabilitation and integration of people with disabilities – Drqnovo UPI XIII Design works in part HVAC and Energy Efficiency
2014 Construction of sewage water treatment plant, sewage network and rehabilitation of water supply network – Lukovit Design works in part HVAC and Energy Efficiency
2013 Design and construction of sewage water treatment plant – Vidin Design works in part HVAC and Energy Efficiency
2013 Preparation of working phase design and construction of the main infrastructure, stage 1 of regional waste depot – Razlog, Bansko, Belitsa and Yakoruda Design works in part HVAC and Energy Efficiency
2013 Design and construction of a regional waste depot, sage 1 – Pleven Design works in part HVAC and Energy Efficiency
2013 Regional system for waste management in Pernik /aid contract: dir-592115-c001/ Design and construction of a sorting and composting factory Design works in part HVAC and Energy Efficiency
2013 Construction of an information center at Hunting grounds “Palamara” – Shumen Design works in part HVAC and Energy Efficiency
2013 Reconstruction of a building with local historical and cultural significanse and improving the surrounding area including landshafting – Karamanovo, Cenovo municipality Design works in part HVAC and Energy Efficiency
2013 Reconstruction and repurposing of a natural juice prodiction hall into storage facility for bottled drinks, black and white appliances with an administrative section – Sofia Design works in part HVAC and Energy Efficiency
Cool Consult