Година |
Вид и местонахождение на СМР съгласно договора |
Описание на СМР |
2014 |
Irrigation system of exporting material belts of Rough Splitting 1 unit of Elacite complex |
Delivery and installation of part Technological
|
2014 |
Combined building – hotel, commercial, bank, offices and other spaces at UPI IV, town of Etropole; Stage 2 of Block A |
Delivery and installation of subpart HVAC
|
2014 |
Reconstruction and modernization of municipal depot for solid waste in the town of Gabrovo |
Delivery and installation in subpart HVAC
|
Година |
Вид и местонахождение на СМР съгласно договора |
Описание на СМР |
2014г. |
Internal reorganization of the office-building logistic warehouses of “Orgachim” AD – office building with stores of “Libra” EAD |
Delivery and installation of air conditioning systems
|
2014 |
Filtration system for dusty air, extracted from ventilation system of unit Rough Splitting 1 of Elacite complex |
Delivery and installation of subpart: “Technological”
|
2014 |
Filtration station of exhaust mining water, leaking from the site of Elacite complex |
Delivery and installation of subpart HVAC
|
2013 |
Separation systems for Vermiculite material for the Helix company in town of Elin Pelin |
Delivery and installation of subpart HVAC and Technological – filtration of dust from the exhaust air
|
Година |
Вид и местонахождение на СМР съгласно договора |
Описание на СМР |
2014 |
Combined building – hotel, commercial, bank, offices and other spaces at UPI IV, town of Etropole; Stage 2 of Block A |
Delivery and installation of subpart HVAC
|
2013 |
Repurposing, reconstruction and energy efficiency measures in a dedicated administrative part of a building on Knjaz Dondukov 68, headquarters of Generally Insurance JSC |
Delivery and installation of subpart HVAC
|
2013 |
Multifunctional complex “San Stefano Plaza” Sofia |
Delivery and installation of ventilation extraction system on 2,3,4 sublevels to -3.6m.
|
2013 |
Residential building with underground parking places, offices and coffee shop, UPI III kv. 55m. Lagera, Sofia |
Delivery and installation of HVAC systems
|
2012 |
Renovation of a Child clinic at level 0.00 – Traumatology and corresponding quarters at UMBAL MS Pirogov |
Delivery and installation of ventilation and air conditioning systems
|
2012 |
Storage base and offices UPI IX – 612 kv. 21A, Krivina village, Simba Toys OOD |
Delivery and installation of HVAC systems
|
2011 |
Repurposing and renovation of floor 4 of administrative building on Kaloyan street 8 – “High Lawyer Council” |
Delivery and installation of ventilation and heating systems
|
2011 |
National health complex – town houses in UPI III kv. 153, town of Berkovica |
Delivery and installation of HVAC systems
|
2011 |
Single story buildings and repurposing of level 0.00 and -3.2 of SPKO at UMBALSM Pirogov |
Delivery and installation of HVAC systems
|
Година |
Вид и местонахождение на СМР съгласно договора |
Описание на СМР |
2014г. |
Internal reorganization of the office-building logistic warehouses of “Orgachim” AD – office building with stores of “Libra” EAD |
Delivery and installation of air conditioning systems
|
2014 |
Building for sample separation, in the territory of Elacite complex |
Delivery and installation of works in part HVAC and Technological systems
|
2014 |
Filtration system for dusted extract air from ventilation of KET 1 – ProSonic dust separation system |
Delivery and installation of works in part HVAC and Technological systems
|
2013 |
Separation systems for Vermiculite material for the Helix company in town of Elin Pelin |
Delivery and installation of subpart HVAC and Technological – filtration of dust from the exhaust air
|
2013 |
Filtration station of exhaust mining water, leaking from the site of Elacite complex |
Delivery and installation of subpart HVAC
|
2013 |
Oil storage at TAT unit |
Delivery and installation of works in part HVAC
|
2012 |
KET 3 Trestle and over loaded junction – fresh air induction in the territory of Elacite complex |
Delivery and installation of works in part HVAC and Technological systems
|
2012 |
Overloaded junction in Small and medium splitting hall |
Delivery and installation of works in part HVAC
|
2012 |
Reconstruction of Molybdenum manufacturing |
Delivery and installation of works in part HVAC
|
2011 |
EBB manufacturing hall. Subproject: Intermediary storage of micro bubbles |
Delivery and installation of works in part HVAC
|
Година |
Обект |
Обхват |
2014 |
Construction of a multipurpose sports hall – Pleven UPI II1076 |
Design works in part HVAC and Energy Efficiency
|
2014 |
Sports hall with a center for reabilitation and integration of people with disabilities – Drqnovo UPI XIII |
Design works in part HVAC and Energy Efficiency
|
2014 |
Construction of sewage water treatment plant, sewage network and rehabilitation of water supply network – Lukovit |
Design works in part HVAC and Energy Efficiency
|
2013 |
Design and construction of sewage water treatment plant – Vidin |
Design works in part HVAC and Energy Efficiency
|
2013 |
Preparation of working phase design and construction of the main infrastructure, stage 1 of regional waste depot – Razlog, Bansko, Belitsa and Yakoruda |
Design works in part HVAC and Energy Efficiency
|
2013 |
Design and construction of a regional waste depot, sage 1 – Pleven |
Design works in part HVAC and Energy Efficiency
|
2013 |
Regional system for waste management in Pernik /aid contract: dir-592115-c001/ Design and construction of a sorting and composting factory |
Design works in part HVAC and Energy Efficiency
|
2013 |
Construction of an information center at Hunting grounds “Palamara” – Shumen |
Design works in part HVAC and Energy Efficiency
|
2013 |
Reconstruction of a building with local historical and cultural significanse and improving the surrounding area including landshafting – Karamanovo, Cenovo municipality |
Design works in part HVAC and Energy Efficiency
|
2013 |
Reconstruction and repurposing of a natural juice prodiction hall into storage facility for bottled drinks, black and white appliances with an administrative section – Sofia |
Design works in part HVAC and Energy Efficiency
|